Evaluasi Non-Physical Waste Pada Proyek Pembangunan Gedung Rumah Sakit X Dengan Penerapan Lean Construction
I will put the dimension here
Abstract
In construction projects, waste encompasses not only material waste (physical waste) but also includes non-value-added activities such as rework, waiting time, and delays (non-physical waste). Construction practitioners often focus on physical waste, neglecting the importance of non-physical waste, which is a critical issue that deserves attention and effective solutions. Therefore, efforts are necessary to minimize non-physical waste by implementing lean construction methods. This study aims to identify critical non-physical waste and its causes, providing recommendations for preventing them through lean construction. The research involved observations, questionnaires, and interviews, with data analyzed using the Borda method. The findings revealed that the critical non-physical waste in the RS X project was waiting, with a weight of 0.204, primarily due to slow approvals, followed by defects with a weight of 0.180, caused by inadequate supervision. To address waiting, it is recommended to apply the Lean principles of Specify Value and Value Stream Mapping, along with tools like the Last Planner System and Daily Huddle Meetings. For defects, the Value Stream Mapping and Flow approaches, supported by tools such as Fail-Safe for Quality and First-Run Studies, are suggested. While not yet fully optimized, the use of lean construction tools positively impacts the reduction of non-physical waste, thereby enhancing project efficiency and quality.
References
A. Nursin, Y. Latief, and I. Abidin, “Pertumbuhan Barang Sisa Konstruksi (Construction Waste) Di Indonesia,” Politeknologi, vol. 13, no. 1, pp. 1–6, 2014.
M. G. Tamallo and A. Nursin, “Evaluasi Non-Physical Waste Dengan Lean Construction Pada Proyek Gedung Sanggala,” PROKONS Jur. Tek. Sipil, vol. 14, no. 2, p. 12, 2020, doi: 10.33795/prokons.v14i2.294.
S. Alwi, K. Hampson, and S. Mohamed, “Waste in the Indonesian Construction Project,” Proc. 1st Int. Conf. CIB W107 – Creat. a Sustain. Constr. Ind. Dev. Ctries., no. January 2002, pp. 305–315, 2002.
S. Nagapan, I. Abdul Rahman, and A. Asmi, “Factors Contributing to Physical and Non-Physical Waste Generation in Construction Industry,” Int. J. Adv. Appl. Sci., vol. 1, no. 1, 2012, doi: 10.11591/ijaas.v1i1.476.
Aleksandrova Hasiyana, “REDUCTION OF NON-PHYSICAL WASTE ON CONSTRUCTION SITES USING RESOURCE MANAGEMENT Master Thesis of Construction Management, 4 th Semester Hasiyana Aleksandrova and Egle Eismontaite,” 2020.
J. Alieva and R. von Haartman, “Digital MudA - The new form of waste by Industry 4.0,” Oper. Supply Chain Manag., vol. 13, no. 3, pp. 269–278, 2020, doi: 10.31387/OSCM0420268.
M. S. Bajjou and A. Chafi, “Identifying and Managing Critical Waste Factors for Lean Construction Projects,” EMJ - Eng. Manag. J., vol. 32, no. 1, pp. 2–13, 2020, doi: 10.1080/10429247.2019.1656479.
L. Koskela, “An exploration towards a production theory and its application to construction,” VTT Publ., no. 408, 2000.
W. S. Ho, S. T. Tan, H. Hashim, J. S. Lim, and C. T. Lee, “Waste Management Pinch Analysis (WAMPA) for Carbon Emission Reduction,” Energy Procedia, vol. 75, no. December, pp. 2448–2453, 2015, doi: 10.1016/j.egypro.2015.07.213.
M. S. Bajjou, A. Chafi, and A. En-Nadi, “A comparative study between lean construction and the traditional production system,” Int. J. Eng. Res. Africa, vol. 29, pp. 118–132, 2017, doi: 10.4028/www.scientific.net/JERA.29.118.
M. S. Bajjou and A. Chafi, “The potential effectiveness of lean construction principles in reducing construction process waste: An input-output model,” J. Mech. Eng. Sci., vol. 12, no. December, pp. 4141–4160, 2018, doi: 10.15282/jmes.12.4.2018.12.0358.
M. A. M. Fateh and N. A. Sulaiman, “Preliminary study on awareness of the lean concept from the non-physical waste perspective,” Malaysian Constr. Res. J., vol. 14, no. 3 Special issue, pp. 12–26, 2021.
M. J. Maraqa, R. Sacks, and S. Spatari, “Strategies for reducing construction waste using lean principles,” Resour. Conserv. Recycl. Adv., vol. 19, no. August, p. 200180, 2023, doi: 10.1016/j.rcradv.2023.200180.
M. Aslam, Z. Gao, and G. Smith, “Exploring factors for implementing lean construction for rapid initial successes in construction,” J. Clean. Prod., vol. 277, p. 123295, 2020, doi: 10.1016/j.jclepro.2020.123295.
L. Eta, G. Mirayudia, I. Bagus, P. Bintana, and I. G. A. P. Dewi, “ANALISIS METODE LEAN CONSTRUCTION DAN PENJADWALAN CCPM DALAM MEREDUKSI NONPHYSICAL CONSTRUCTION WASTE (Studi Kasus : Proyek Pembuatan Gedung PKP-PK di Bandara I Gusti Ngurah Rai),” 2021.
R. Justan, Margiono, A. Aziz, and Sumiati, “Metode Penelitian Kombinasi (Mixed Methods),” Bandung Alf., vol. 3, no. 2, pp. 253–263, 2023.
H. L. Wang, C. W & Leung, “A secure and fully private borda voting protocol with universal verifiability. s.l., COMPSAC.,” 2004.
Copyright (c) 2025 Rasendriya Rizki Danureswara, Suripto

This work is licensed under a Creative Commons Attribution 4.0 International License.