Analisa Produktivitas Tiang Menggunakan Alat Pancang Diesel Hammer Pada Proyek Pembangunan Gedung Kantor Pengadilan Agama Dataran Hunipopu

  • Ramona Istiqamah Marasabessy Politeknik Negeri Ambon
  • Henriette Dorothy Titaley Politeknik Negeri Ambon
  • Maslan Abdin Politeknik Negeri Ambon
DOI: https://doi.org/10.52158/jaceit.v7i2.1157
I will put the dimension here
Keywords: Produktivity, Pilling, Diesel Hammer

Abstract

The pile driving process is a crucial stage in foundation construction, ensuring the stability and strength of the building structure. Piling can be done with various types of tools, one of which is a diesel hammer. Diesel hammers are renowned for delivering significant impact energy to piles, enabling effective and efficient soil penetration. The purpose of this research is to determine the cycle time of the piling process and to determine the productivity of piling using diesel hammer tools. The method used in this research is direct observation in the field. The results obtained from the research were the average cycle time in the piling process using a diesel hammer piling tool at 101 points for 16 days, which was 50.35 minutes during normal working hours and 59.94 minutes during overtime. The productivity of the diesel hammer on the work of the Religious Court Office Building was the lowest on the first day, with a productivity value of 10.48 m/hour, and the highest occurred on day fifteen, with a productivity value of 17.25 m/hour. During overtime working hours, the highest productivity was recorded on the fifteenth day at 16.71 m/hour, while the lowest was on the first day at 4.01 m/hour.

References

Abdurrahman, “Analisa Produktivitas Pekerjaan Pemancangan Tiang Pancang Pada Proyek Pembangunan Bank Bca Kcu Kota Pekanbaru,” 2020.

H. Tannady, C. H. Santoso, M. Kelly, and Yulianto, “Mengukur produktivitas kerja karyawan seven eleven mangga dua,” J. Ind. Eng. Manag. Syst., vol. 8, no. 2, pp. 1–6, 2017, [Online]. Available: https://journal.ubm.ac.id/index.php/jiems/article/view/119

A. B. Utama, G. Primaswari, and A. B. Utomo, “Produktivitas Hydraulic static pile driver Pada Proyek Pembangunan Rumah Susun Mahasiswa Politeknik Pekerjaan Umum,” Jurnal.Polines, vol. 18, no. 2, pp. 98–108, 2022.

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia, “LAMPIRAN Nomor : 28/PRT/M/2016 Tentang Analisis Satuan Pekerjaan Bidang Pekerjaan Umum,” pp. 1–883, 2016.

E. Handayani and F. Akbar, “Kajian Efisiensi Produktifitas Alat Berat pada Proyek Jalan (Studi kasus: Ruas Jalan Mendalo Darat (Sp.Tiga)-Bts.Kota Jambi),” J. Civronlit Unbari, vol. 5, no. 1, p. 16, 2020, doi: 10.33087/civronlit.v5i1.63.

Published
2025-11-12
How to Cite
Marasabessy, R. I., Titaley, H. D., & Abdin, M. (2025). Analisa Produktivitas Tiang Menggunakan Alat Pancang Diesel Hammer Pada Proyek Pembangunan Gedung Kantor Pengadilan Agama Dataran Hunipopu. Journal of Applied Civil Engineering and Infrastructure Technology, 7(2), 110 - 113. https://doi.org/10.52158/jaceit.v7i2.1157