Analisis Building Information Modelling (BIM) 5D Pada Pekerjaan Struktur Beton Bertulang Bangunan Kantor Kebun Muara Lawa
I will put the dimension here
Abstract
In this modern era, the construction industry has undergone a significant transformation with the adoption of digital technology. One of the innovations in the construction industry today is Building Information Modeling, or BIM, as a tool to manage projects efficiently and become part of the digital industrial sector. Accuracy in construction cost estimation is very important to get an efficient value in planning. Currently, cost budget calculations on development projects still often use conventional methods that produce greater value. Therefore, this research uses the concept of BIM dimension 5D which aims to analyze the volume and cost estimates and analyze the difference in volume and cost using the BIM dimension 5D method and conventional methods on the construction of the Muara Lawa West Kutai Garden Office Development structure. The results of the research on the structural work of the Muara Lawa Kutai Barat Office Garden Development using the 5D concept produced a steel volume of 1102.14 kg with a cost of Rp. 18,956,808.00. A concrete volume of 6.6 m3 with a cost of Rp. 30,201,875. This resulted in a steel volume difference of 13.53% and a concrete volume difference of 10.22%. This means that the calculations using the 5D BIM concept are lower compared to the cost planning produced by the Contractor.
References
W. H. Putri and N. C. Kresnanto, Seminar Nasional Diseminasi Hasil Penelitian, vol. 55. 2021.
R. Dwi Novita and E. K. Pangestuti, “Analisa Quantity Take Off Dan Rencana Anggaran Biaya Dengan Metode Building Information Modeling (BIM) Menggunakan Software Autodeks Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang).”
M. Fadillah, “Quantity Take-Off Pekerjaan Struktur Berbasis Building Information Modeling (BIM) Pembangunan Gedung Kantor Pelayanan Pajak Pratama Balige,” Jurnal Ilmiah Teknik Sipil, vol. 2, no. 1, 2022, doi: 10.51510/agregat.v2i1.733.
A. Farhana and V. Abma, “Implementasi Konsep BIM 5D Pada Pekerjaan Struktur Proyek Gedung,” 2022. [Online]. Available: http://jurnal.univrab.ac.id/index.php/racic
F. N. Umam, E. Erizal, and H. Putra, “Peningkatan Efisiensi Biaya Pembangunan Gedung Bertingkat Dengan Aplikasi Building Information Modeling (BIM) 5D,” Teras Jurnal : Jurnal Teknik Sipil, vol. 12, no. 1, p. 245, Apr. 2022, doi: 10.29103/tj.v12i1.704.
N. S. Sukmadinata, Metode Penelitian Pendidikan. Bandung, 2011.
Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung, 2013.
Sugiyono, Metode Penelitian Pendidikan. 2015.
R. M., Supriadi. Hasanah, “Penggunaan Metode Pembelajaran Konvesional Pada Mata Pelajaran Ipa Siswa Sekolah Dasar,” pp. 72–75, 2022.
I. Aulya Reista and dan Ilham, “Implementasi Building Information Modelling (BIM) dalam Estimasi Volume Pekerjaan Struktural dan Arsitektural,” Journal of Sustainable Construction, vol. 2, no. 1, pp. 13–22, [Online]. Available: https://journal.unpar.ac.id/index.php/josc
Copyright (c) 2025 Ikbal Setiawan, Irna Hendriyani, Reno Pratiwi

This work is licensed under a Creative Commons Attribution 4.0 International License.