Soetjipto, J. W., N. H. Qudsy, and S. Arifin. “Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk”. Journal of Applied Civil Engineering and Infrastructure Technology, Vol. 2, no. 1, Aug. 2021, pp. 19-26, doi:10.52158/jaceit.v2i1.149.