“Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk”. Journal of Applied Civil Engineering and Infrastructure Technology, vol. 2, no. 1, Aug. 2021, pp. 19-26, https://doi.org/10.52158/jaceit.v2i1.149.