[1]
“Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk”, J. of Appl. Civ. Eng. and Infrastruct. Technol., vol. 2, no. 1, pp. 19–26, Aug. 2021, doi: 10.52158/jaceit.v2i1.149.