Nirwan, A., Rulhendri and Murtedjo, T. (2025) “Studi Rencana Penentuan Halte Sistem Angkutan Umum Massal Berbasis Jalan Pada Koridor 6 Di Kabupaten Bogor (Ciawi-Cisarua)”, Journal of Applied Civil Engineering and Infrastructure Technology, 7(1), pp. 1 - 14. doi: 10.52158/jaceit.v7i1.832.