“Probabilitas Ketepatan Biaya Dan Waktu Dengan Metode Monte Carlo Pada Konsep Earned Value Untuk Proyek Jalan” (2023) Journal of Applied Civil Engineering and Infrastructure Technology, 4(1), pp. 42–47. doi:10.52158/jaceit.v4i1.151.