“Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk”. 2021. Journal of Applied Civil Engineering and Infrastructure Technology 2 (1): 19-26. https://doi.org/10.52158/jaceit.v2i1.149.