Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk. Journal of Applied Civil Engineering and Infrastructure Technology, [S. l.], v. 2, n. 1, p. 19–26, 2021. DOI: 10.52158/jaceit.v2i1.149. Disponível em: https://journal.isas.or.id/index.php/JACEIT/article/view/149. Acesso em: 14 dec. 2025.