Analisis Biaya Pekerjaan Timbunan Tanah Dengan Metode Photogrammetry. Journal of Applied Civil Engineering and Infrastructure Technology, [S. l.], v. 7, n. 2, p. 139–143, 2025. DOI: 10.52158/jaceit.v7i2.1279. Disponível em: https://journal.isas.or.id/index.php/JACEIT/article/view/1279. Acesso em: 11 dec. 2025.