Soetjipto, J. W., Qudsy, N. H., & Arifin, S. (2021). Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk. Journal of Applied Civil Engineering and Infrastructure Technology, 2(1), 19-26. https://doi.org/10.52158/jaceit.v2i1.149