Analisis Biaya Pekerjaan Timbunan Tanah Dengan Metode Photogrammetry. (2025). Journal of Applied Civil Engineering and Infrastructure Technology, 7(2), 139-143. https://doi.org/10.52158/jaceit.v7i2.1279