(1)
Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk. J. of Appl. Civ. Eng. and Infrastruct. Technol. 2021, 2 (1), 19-26. https://doi.org/10.52158/jaceit.v2i1.149.