(1)
Analisis Biaya Pekerjaan Timbunan Tanah Dengan Metode Photogrammetry. J. of Appl. Civ. Eng. and Infrastruct. Technol. 2025, 7 (2), 139-143. https://doi.org/10.52158/jaceit.v7i2.1279.