[1]
Fahira Khairani and Supriyadi, I. 2021. Analisis Faktor Keterlambatan Pada Pembangunan Proyek X. Journal of Applied Civil Engineering and Infrastructure Technology. 2, 2 (Dec. 2021), 39-45. DOI:https://doi.org/10.52158/jaceit.v2i2.248.