[1]
Soetjipto, J.W., Qudsy, N.H. and Arifin, S. 2021. Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk. Journal of Applied Civil Engineering and Infrastructure Technology. 2, 1 (Aug. 2021), 19-26. DOI:https://doi.org/10.52158/jaceit.v2i1.149.